search site
NEWS ABOUT US PROFILES PARTNERS CAREERS MEDIA CONTACT DOWNLOADS Home
choose one

FPSO Conversion

In November 2006, Remontowa S.A. was awarded a contract to convert an FPSO for Teekay Petrojarl AS. This is the next step in Remontowa’s expansion into the offshore conversion market, i.e. conversions / upgrades shuttle tankers, FSO, heavy lift vessels, support vessels, semi submersible drill rigs, accommodation units, which have been so far successfully carried out for major offshore customers. The 46.000 DWT tanker arrived at the yard berths in December 2006.

Principal Dimensions

Length overall

182.97

Breadth moulded

32.20

Depth moulded

16.10

Design Draft

10.60

Accommodation

total 60 persons

The main FPSO conversion items are:

  • Bow offloading
  • Flare tower
  • Mooring arrangements - 6 anchors aft and 6 anchors forward
  • Process module, Metering module, Utility module, Switchboard modules delivered by Teekay Petrojarl AS and Power generation module
  • Riser balcony, lay down area
  • Boiler with auxiliaries
  • Forward and aft offshore cranes
  • Extended central control room - the control system for the process to be located here
  • Lifesaving appliances
  • Helicopter deck
  • Totally refurbishment of the accommodation

Remontowa will carry out the complete work, including prefabrication, structural constructions, installation, new / modified piping, electrical, control, alarm, communication systems, termination, testing and commissioning of the vessel’s FPSO systems.

The converted FPSO will be used by Petrobras at Siri Campo field.

The FPSO shall be arranged as per above General Arrangement.


Login Pass
Copyright 2005 Remontowa